Filtered by vendor Critical Path
                         Subscriptions
                    
                    
                
                        Filtered by product Livecontent Directory
                         Subscriptions
                    
                    
                
                    Total
                    2 CVE
                
            | CVE | Vendors | Products | Updated | CVSS v3.1 | 
|---|---|---|---|---|
| CVE-2001-1315 | 1 Critical Path | 2 Injoin Directory Server, Livecontent Directory | 2025-04-03 | N/A | 
| Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. | ||||
| CVE-2001-1314 | 1 Critical Path | 2 Injoin Directory Server, Livecontent Directory | 2025-04-03 | N/A | 
| Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. | ||||
                            
                                
                                
                                    Page 1 of 1.